A 120MW distributed solar program built across four countries in under three years.

The challenge

Manufacturing clients across Southeast Asia faced rising grid tariffs and increasingly frequent outages, with no realistic path to on-site generation at the scale they needed.

What we did

We developed a distributed portfolio of rooftop and ground-mount solar across four countries, structured under long-term power purchase agreements so clients carried no capital cost. Storage was sized against each site’s outage profile rather than a single standard.

The outcome

120MW of installed capacity, an average 28% reduction in energy cost for participating sites, and a measurable improvement in production continuity at the sites where outages had been most disruptive.